References
Project developers from infrastructure, energy, industry and local government trust greeNature. References and major projects such as SuedLink and Rhein-Main-Link.
Project developers who rely on greeNature
With long-standing experience in eco-account and compensation area management as well as in species protection measures, greeNature solutions supports companies and local authorities across very different projects. From the railways to transmission system operators to industry and local government: demanding project developers trust greeNature for eco-accounts, compensation areas and species protection.
Infrastructure and rail
Energy supply and grid expansion
Renewable energy
Extraction and raw materials
Industry and site expansion
Communications projects
Development and municipal urban planning
Major projects in detail
SuedLink, high-voltage direct current transmission (HVDC)
Project developer: TenneT TSO GmbH and TransnetBW GmbH. Client: R&K Ingenieure GmbH. Cooperation partner: GI Geoinformatik GmbH. Period: 2019 to 2024. Project size: around 700 kilometres of route length, working area of over 70,000 hectares.
The brief was the development and management of the geodata processes for the nature conservation surveys that feed into the planning approval documents. greeNature took on the management of the geodata process, the role of solution architect, and the interface management between specialist requirements, technical requirements and the surveying offices carrying out the work.
Implementation was based on an ArcGIS Enterprise platform:
- building geodata infrastructures and GIS data models
- automated checking, handover and archiving routines, including the integration of right-of-way matters
- GIS data quality management with automated checking of geometry, structure and attributes
- a central geoportal with integrated WebGIS and individual access rights management for all parties involved
- interfaces to systems such as FME and LaRA
- right-of-way maps for local public notice and for letters to landowners
Rhein-Main-Link, high-voltage direct current transmission (HVDC)
Project developer: ARGE ILF/Arcadis, main client Amprion GmbH. Client: R&K Ingenieure GmbH. Cooperation partner: GI Geoinformatik GmbH. Period: since early 2024, ongoing. Project size: around 600 kilometres of route length, working area of around 30,000 hectares.
Here too, greeNature is responsible for the development and management of the geodata processes for the nature conservation surveys in the planning approval documents: geodata infrastructure and data models on ArcGIS Enterprise, automated technical solutions for checking, handing over and managing the data, GIS data quality management, access rights management, and interfaces to the client, including a SharePoint connection.
What these projects show
Compensation in a major project rarely fails because of the individual measure, but because of the data situation: surveys from several offices, changing planning states, requirements from several permitting authorities. We apply the same systematic approach that kept over 100,000 hectares of working area robust in SuedLink and Rhein-Main-Link in smaller projects too. More on this under Geodata management and Project management.
Good to know
Your project as our next reference
Talk to us about compensation and project management for your project.